Machinery and resources

PERSONNEL OF CLF GROUP

Our personnel is the key of our success!

The degree of specialization achieved by the operational and technical personnel guarantees quality and efficiency, enabling CLF group to place itself at the highest levels in all areas in which it operates.

dati-occupazionali-gruppo-clf-(2).JPG

MACHINERY FLEET AND EQUIPMENT


CLF Group continuously invests significant resources in the renewal of the machinery fleet and state-of-the-art technologies to meet the growing needs of the Clients.

 

CLF uses highly specialized machinery to work on fully automated sites, ensuring quality standards, high productivity, reducing construction time and associated risks.
 

Track renewal trains

Track renewal trains

6 trains for the track renewal
New track construction train

New track construction train

1 train for the track construction
Profiling machines

Profiling machines

15 machines for the ballast plough
Tamping machines

Tamping machines

25 machines for the track and switches tamping
Ballast cleaning machines

Ballast cleaning machines

6 Machines for the cleaning/screening of the ballast
Road-rail loaders

Road-rail loaders

50 loaders for the loading and unloading of railway equipment
Locomotives

Locomotives

35 machines with diesel traction for the transport
Portal cranes for the laying of turnouts

Portal cranes for the laying of turnouts

18 machinery for the handling and laying of turnouts
Welding machines

Welding machines

10 machines for the flash-butt welding of rails
Method of loading and unloading of rails

Method of loading and unloading of rails

4 machinery for the handling of rails
Tracked crane for laying

Tracked crane for laying

1 machinery for the laying of turnouts/track
Dynamic stabilizer

Dynamic stabilizer

1 stabilizer and consolidating machine DGS 62N

Wagons with conveyors for old ballast

38 wagons for the collection and transport of old ballast

Hopper wagons for the transport of ballast

90 wagons for the transport and unloading of railway ballast

Flat wagons

50 wagons for the transport of sleepers and railway equipment

MAINTENANCE OF THE MACHINERY

The Operational Centre, RFI Certified as MAINTENANCE WORKSHOP OF THE MACHINERY is located in Reggio Emilia: this centre includes a rail yard with 600 ml of connecting tracks, 100 of which are covered, directly connected to the Milano - Bologna railway line. The lot also includes 750 square meters of sheds on a 3,400 sqm lot, equipped with advanced services and equipment for the maintenance of the machinery.