GEOGRAPHICAL PRESENCE AND REFERENCES

MAIN WORKS IN ITALY

 

Rete Ferroviaria Italiana
Framework Agreement: Program of systematic maintenance interventions of the railway infrastructure. Lot NORTH/EAST, NORTH/WEST and CENTER.

Rete Ferroviaria Italiana
Framework Agreement: Program of maintenance interventions of renewal of the railway infrastructure. Lot NORTH and CENTER.

Rete Ferroviaria Italiana
Speeding up of the Adriatic Line Bologna–Bari in the Bologna–Rimini Section.

Ferrovie del Sud Est
Undergrounding of the Bari–Taranto Line, Bari Mungivacca–Noicattaro Section

ITINERA S.p.A.
Connection Terminal T1–T2 at Malpensa Airport

Ferrovie Emilia Romagna
Framework Agreement: Program of systematic maintenance interventions of the railway insfrastructure.

Rete Ferroviaria Italiana
Extraordinary maintenance works for the adjustment to the PC80 pattern of the Luino pass.

Cepav uno
Design and construction of the railway superstructure for both the High Speed double track Line Milano–Bologna from progr. Km 0,733 to the progr. Km 182,148 and relocation of the historic line in the Municipality of Modena.

Rete Ferroviaria Italiana
Design and construction of the railway infrastructure of the new  tunnels underlying the Bologna Junction, the HS Station and the Km 4 + 000 approximately of the Bologna–Milano High Speed Line, as well as the HS interconnections with the BO–VR Line and the BO–PD of the Junction itself.

METRO C scpa
Laying of the railway infrastructure on ballast, for T7 and T6A, T4 and T5 sections.

Strutture Trasporto Alto Adige
Restoration works on railway infrastructure for the Merano-Malles Line.

ASTALDI S.p.A.
Subcontracting of the works for the doubling of the railway Line Parma-La Spezia in the section between Solignano Station and P.D.M. of Osteriazza.

ITALFERR S.p.A.
Infrastructural development works for the Genova Voltri–Genova Brignole of the Genova railway junction.
 

MAIN WORKS ABROAD

 

DANIMARCA:
Construction of the railway line Ringsted-Copenaghen (112 km).

ALGERIA:
Execution of the railway connection Slissen-Moulay-Saida for about 124 km. of single track.

ALGERIA:
Execution of the railway connection Saida-Tiaret.

ALGERIA:
Execution of the Oued Tlelat/Tlemcen (130km) section of the new electrified double track line Oued Tlelat/Moroccan Border.

VENEZUELA:
Execution of the Puerto Cabello–La Encrucijada Line on the section San

VENEZUELA:
Maintenanace of the Caracas – Cua Line and of the Caracas, Cherallave Norte, Cherallave Sur and Cua Stations.

CROAZIA:
Renewal and rehabilitation works of the ballast between Metkovic and Ploce Stations.

BULGARIA:
Works on Plodviv–Svilengrad Line in the Krumovo–Parvomai Section for a total of 36,92 km.

MONTENEGRO:
Rehabilitation of the Bar-Vrbnica railway line for the section from Kolasin Station to Trebalijevo.

MONTENEGRO:
Rehabilitation of the Bar-Vrbnica railway Line for the section from Mijatovo Kolo Station to Moijkovac Station.